Week
41: October 5 - 12 |
|
|
Last updated: |
08-Oct-20 |
16:05 |
|
|
|
|
Maintenance this week |
Date |
Time & Length |
Production resumes |
|
|
|
|
520 MeV |
Tuesday, Oct. 6 |
6 hr maintenance
starting at 08:30 - 14:30, followed by 3 hours start-up & tuning |
17:30 |
|
|
|
|
|
|
ISIS will be tuned by
Experts during maintenance. |
|
|
|
|
|
|
ISAC |
Tuesday, Oct. 6 |
8 hr followed by 16
hr of start-up |
|
|
|
|
|
|
E-LINAC |
Maintenance on-going.
E-Hall open Monday - Wednesday until portable power station installed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GROUP |
ACTIVITY |
|
Fault Report |
Work Permit |
|
|
|
|
ATG |
TBD @ STF
(continue tgt failure investigations |
520 MeV |
- |
C2020-10-06-10 |
ongoing |
|
|
|
|
|
|
|
|
|
|
|
|
Beamlines |
Address 1AQ6 water flow fault (lower vault
controlled access) |
520 MeV |
13472 |
C2020-10-06-1 |
y |
|
|
|
|
Troubleshoot 1VB1 (water flow, lower vault
controlled access) |
520 MeV |
13418 |
C2020-10-06-1 |
y |
|
|
|
|
|
|
|
|
|
|
|
|
Computing and Networking |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Controls |
GEC1-b6-c01
troubleshooting and fault correction |
520 MeV |
13475 |
C2020-10-06-6 |
y |
|
|
|
|
|
|
|
|
|
|
|
|
Cryogenics and Vacuum |
Replace 1TP2.5 controller |
520 MeV |
13399 |
C2020-10-06-2 |
y |
|
|
|
|
|
|
|
|
|
|
|
|
Diagnostics |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Electrostatics and Power Supplies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Experimental Support |
|
|
|
|
|
|
|
|
|
Check oil level in pumps and add oil to blower
#3 |
520 MeV |
- |
C2020-10-06-7 |
y |
|
|
|
|
|
|
|
|
|
|
|
|
|
ISAC Target Hall |
ITW -> ITE |
ISAC |
- |
- |
y |
|
|
|
|
|
|
|
|
|
|
|
|
ISIS |
Tune ISIS for higher currents |
520 MeV |
- |
- |
y |
|
|
|
|
Regenerate cryopumps if necessary |
520 MeV |
- |
C2020-10-06-3 |
y - more work needed |
|
|
|
|
|
|
|
|
|
|
|
Life Sciences |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Magnets and Power Supplies |
Troubleshoot 1VB1 ps instability |
520 MeV |
13469 |
C2020-10-06-4 |
y |
|
|
|
|
|
|
|
|
|
|
|
|
Operations |
Switch from 2A2/ITW -> 2A3/ITE |
520 MeV/ISAC |
- |
- |
y |
|
|
|
|
Sump checks |
All |
- |
- |
y |
|
|
|
|
SCBCD & SCRM Tests |
520 MeV |
- |
- |
y |
|
|
|
Remote Handling |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RF |
Increase cyclotron RF DV |
520 MeV |
- |
- |
y |
|
|
|
|
|
|
|
|
|
|
|
|
Safety |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Site Services |
SAB3 pump check |
520 MeV |
- |
- |
n |
|
|
|
Mechanical, Civil/Structural,
Electrical, FAS |
ISAC Cooling Tower preventative maintenance |
ISAC |
- |
|
y |
|
|
|
|
E-LINAC HAW work in SAB3 Tunnel |
E-Hall |
- |
|
y |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|