Week 35:  August 24 - 31 Last updated:   21-Aug-20
Maintenance this week Date Time & Length Production resumes
520 MeV Tues. Aug. 25, 2020 4 hr starting at 08:30 + 30 min start-up  (TBC at Aug. 26 11 AM meeting) 13:00
ISAC
E-LINAC - - -
ARIEL - - -
                   
GROUP ACTIVITY Fault Report Work Permit Completed
ATG Replace faulty STF resistivity meter  13366
Beamlines Meson Hall Block move back into the Meson Hall (Aug. 26 - 27) 520 MeV
Computing and Networking
Controls
Cryogenics and Vacuum
Diagnostics
Electrostatics and Power Supplies
Experimental Support
ISAC Target Hall
ISIS
Life Sciences
Magnets and Power Supplies
Operations Sump checks All
SCBCD & SCRM Tests 520 MeV
1A secondary beamline ASU testing (emergency trip sections, except for M9) 520 MeV
Switch ITW/2A2 -> ITE/2A3 (TBD) 520 MeV/ISAC
Prepare to run 1B on Thursday, Aug. 27 520 MeV
Remote Handling
RF
Safety
Site Services
Mechanical, Civil/Structural, Electrical, FAS