Week 24: June 8 - 15 Last updated:   02-Jun-20
Maintenance this week Date Time & Length Production resumes
520 MeV Tuesday, June 9 No maintenance. There will be a ~16 hr Beam Develeopment Shift. 23:00
ISAC Shutdown
E-LINAC Shutdown
ARIEL Shutdown
                   
GROUP ACTIVITY Fault Report Work Permit Completed
ATG Repair STF water package ion exchange loop resistivity meter during ISIS portion of beam dev. 520 MeV